For Episode 6 of LEGO Masters, “Need for Speed/Super Bridge” (3/12/2020), Christian and I created the “Arch & Truss” bridge, a double-support structure built to span a 6’ (183cm) gap and hold as much weight as possible.
This 7-hour challenge put teams’ engineering expertise to the test. With so little time to work and a blatantly quantitative assessment at the challenge’s end, there was very little room for error in this challenge. Every choice we made could be the one that catapulted us to victory… or else sent us to the bottom. The stakes were high even without the Golden Brick being up for grabs once more!
Read on for my special dissection of this model’s process, design choices, and more.
Read More